Barrow Hospital – Protection Coordination Study

Aurora is pleased to announce that the company has been appointed by Edward Dewhurst Ltd. to carry out a protection coordination study for a major electrical upgrade at the Barrow in Furness general hospital. The overall project aim is to install a new major LV MCC, and feed the existing MCC from the new MCC, […]

Wyelands Water Treatment Works – CDEGS Earthing Study

Aurora is pleased to announce that it has been selected by AICA / Costain to carry out a detailed CDEGS earthing design study as part of a major upgrade at the Wyelands WTW operated by Severn Trent Water near Ross on Wye, in the UK. Aurora’s role is initially to carry out a detailed, non-invasive […]

Lark Power Services – STOR Project

Aurora is pleased to announce that they have been selected by Lark Energy to carry out a range of power system studies for a new 7.5MW STOR (Short Term Operating Reserve) project at Pye Bridge, Derbyshire in the UK. The STOR project is based on diesel engine technology, with the site consisting of 3x 2.5MW […]

Amtech Protect

Aurora is pleased to announce that it has just invested in a new license module for the well known protection software AMTECH Protect. This industry leading protection coordination programs fits nicely with Aurora’s existing software packages of ETAP and DigSilent. While ETAP and Digsilent are very sophisticated packages, they are more time consuming to operate […]

CDEGS – MALZ, SPLITS & TRALIN

Aurora is pleased to announce that the company has invested in additional license modules for the industry leading earthing design software CDEGS for use by its highly specialised CDEGS consultants. Aurora’s previous license was for the multiground package which included RESAP, MALT and FCDIST. The license upgrade purchased by Aurora now includes the MALZ, SPLITS […]

Polypipe – Electrical Site Survey

Aurora is pleased to announce that they have been selected by Polypipe to carry out an electrical site survey of their production facility in Kent. The aim of the survey is to fully identify the configuration of the electrical plant including voltage profile, operation of the power factor correction equipment and also to identify any […]

Rappa Fencing – Increase of Power Capacity

Aurora is pleased to announce that the company has been selected by Rappa Fencing to carry out a design review of their existing facility to advise on the need for potential increase of power capacity. Rappa Fencing have identified a need to uprate their incoming power supply capacity to meet future demand and maintain compliance […]

UCP Choice – 5MW STOR

Aurora is pleased to announce that the company has been selected by UCP Choice to carry out a range of power system studies for two new 5MW STOR (Short Term Operating Reserve) projects at Finway and Elms. The STOR project is based on gas engine technology, with each site consisting of 2x 2.5MW gas engines […]

Insulation Coordination Studies

Aurora Power Consulting is pleased to now be able to offer insulation coordination studies to our clients! We have recently started working with an expert in this field who has a detailed understanding of power system transient events and behaviour. As Aurora already posses the EMTP, EMTP-ATP and PSCAD/EMTDC software packages, we can now offer […]