Aurora is pleased to announce that they have been selected by Polypipe to carry out an electrical site survey of their production facility in Kent. The aim of the survey is to fully identify the configuration of the electrical plant including voltage profile, operation of the power factor correction equipment and also to identify any potential bottlenecks, areas of optimisation or potential risks to the system. As part of the scope Aurora will prepare a detailed single line diagram and a load list of the site, as well as brief summary report.
Aurora look forward to working with Polypipe, and hope to provide a comprehensive review of their existing infrastructure.