Jacobs / Vopak
Aurora had placed a Senior Consultant into Jacobs offices to support them in a range of Oil & Gas projects. For an existing refinery in the UK, Aurora developed a modification protection design for an 11kV inter-tripping system and validated the operation of the Translay protection scheme following decomissioning of two 11kv current limiting reactors. […]
KBR / Saudi Aramco
Aurora has placed a Senior Consultant into KBR’s Leatherhead offices to support them in a range of Oil & Gas projects. Aurora’s Senior Consultant was used to lead an electrical project team for execution of a full electrical FEED package. As part of the design Aurora was responsible for development of an extensive 230kV power […]
Jacobs Oil and Gas
Aurora has placed a Senior Consultant into Jacobs offices to support them in a range of Jacobs Oil and Gas projects. For a new phosphate mine proposed in Saudi Arabia, Aurora was responsible for developing a full ETAP technical study to determine the fault levels across a 380/132kV power generation system and downstream plant. As part […]
Petrofac / OMV
Aurora had placed a Senior Consultant within the Petrofac office to support them in a range of Oil & Gas projects. Aurora undertook a conceptual study using ETAP to perform a transient analysis to assess the suitability of gas turbines or gas engines as prime power, and the comparative ability of different machines to accept / reject […]
Petrofac / KOC
Aurora had placed a Senior Consultant into Petrofac’s offices to support them in a range of Oil & Gas projects. Aurora undertook a detailed conceptual study using ETAP to develop an initial 11kV power system design and overhead line distribution system for a series 650 new 300kW submersible pumps, spread over a large geographical area […]
KBR / BP
Aurora placed a Senior Consultant into KBR’s Leatherhead offices to support them in a range of Oil & Gas projects. Aurora undertook a conceptual study to analyse expansion of an existing plants’ 110kV distribution network and interface to the local utility company. Aurora also investigated reports of various protection mal-operation events due to transient disturbances […]