Karsang Oil Field — Full Study Suite
Full power system study suite for a greenfield oil field in Kurdistan, covering loadflow, short circuit, motor starting, protection, arc flash, harmonics and stability in ETAP.
Coylton BESS — Grid-Forming Compliance
Full Grid Code compliance for a 50 MW grid-forming BESS at 275 kV, covering RMS, EMT, protection, P28, G5.5, insulation coordination and earthing.
Stublach Gas Storage — Protection & Arc Flash
ETAP study suite for a 40 MW gas storage plant connecting new VSD compressors, covering loadflow, short circuit, full protection re-grading and arc flash investigation.
Falklands Mount Pleasant Airbase
Full ETAP modelling of a large 11 kV islanded network with 70+ substations, covering loadflow, short circuit, protection coordination and arc flash.
Woking & Milton Keynes — iDNO Network Studies
Loadflow, short circuit, protection coordination and CDEGS earthing studies for two town-centre private iDNO networks at Woking and Milton Keynes.
Sanquhar II Wind Farm — Grid Code Compliance
Grid Code compliance for one of the UK’s largest onshore wind farms (250 MW, 132 kV), including RMS, EMT, P28, G5.5, insulation coordination and 132 kV earthing.
South East Water — Site Surveys & Modelling
Rolling survey and ETAP modelling programme across eight critical water treatment works sites, establishing fault level and loadflow baselines ahead of planned solar and BESS upgrades.
Saltend Power Station — Concept Study & LT2029
Concept study for adding rotating stabilisers to an existing 275 kV power station, followed by full LT2029 stability tender submission with RMS simulation studies.
Isle of Sark — Island Network Concept Design
Concept study for upgrading or replacing a 50-year-old island network, integrating solar PV, wind, grid-forming BESS and diesel backup with 100% renewable capability.