Power Generation

Generation is shifting from large CCGT/OCGT plant toward distributed EfW, biomass and CHP, while existing units are adapted for black start or synchronous-condenser duty. We deliver the connection, stability and compliance studies behind these changes.

Overview

Generation is shifting from large CCGT and OCGT plant toward distributed energy-from-waste, biomass and CHP, while existing units are being adapted for black start or synchronous-condenser duty. We deliver the connection, stability and compliance studies behind these changes.

For synchronous plant that means detailed governor, AVR and limiter (OEL/UEL/SCL) modelling for Grid Code and stability-service submissions such as LT2029 and ERS; for smaller embedded generation it means connection design and protection. We’ve supported major 400 kV power stations and small private schemes alike.

How we help
  • Grid Code Compliance Studies
  • ENA G99 Compliance Studies
  • ENA P28.2 Voltage Disturbance Studies
  • ENA G5.5 Harmonic Studies
  • ENA 41-24 Earthing Studies
  • TGN 288E TOV / SOV studies (NGET)
  • Reactive Power Flow studies
  • Protection coordination and setting studies
  • Insulation coordination studies
  • Arc Flash and Fault Level studies
  • PSCAD Modelling
  • AVR Tuning and setting
  • Governor Tuning and settings
  • PSS Tuning and setting
  • Stability Studies
  • Concept development
  • Acting as Owners engineer
  • Advice & Support dealing with DNO Offers
  • Advice & Support dealing with National Grid
  • Reliability & Availability studies
  • Protection scheme design & CT sizing
  • HV cable sizing calculations
  • Earthing Design and Analysis using either CDEGS or XGSLab