Crystal Rig IV — 49 MW Onshore Wind Balance of Plant

Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.

Exeter University — Protection Study

Short circuit and full protection coordination study for a large university campus network with three ring feeders including normally-closed Translay cable differential protection.

Topaz Offshore Rig — Full Study Suite

Complete power system study suite for an offshore rig upgrade with new modular drilling unit, covering loadflow, fault level, motor starting, harmonics, stability and protection.

Karsang Oil Field — Full Study Suite

Full power system study suite for a greenfield oil field in Kurdistan, covering loadflow, short circuit, motor starting, protection, arc flash, harmonics and stability in ETAP.