South East Water — Site Surveys & Modelling

Rolling survey and ETAP modelling programme across eight critical water treatment works sites, establishing fault level and loadflow baselines ahead of planned solar and BESS upgrades.

Upper Boat — 275 kV Cable Design

Complete 275 kV dual-circuit cable design covering current rating, sheath voltage, bonding scheme, pulling forces, joint bay drawings and route layout.