Fabri Consulting – Shell Haven
Aurora are pleased to announce that they have been selected by Fabri Consulting to carry out the HV design aspect of a ‘Select’ stage study, for an electrical upgrade project at the Shell Haven Terminal, at Standford-le-hope. Auroras scope is to develop the HV electrical design, and prepare a detailed protection and metering diagram, carry […]
Wavehub – Safety Audit
Aurora are pleased to announce that they have been appointed by Wavehub, to carry out a safety audit on their key operational site in Cornwall. The Wavehub project is a unique in the UK, and provides a flexible 33kV or 11kV subsea connection point to facilitate the Research and Development in offshore renewable power projects […]
132kV Design – An Overview
This is a short post about the key ideas of 132kV design practices, too finish off the last of this series. In the UK, 132kV is the standard primary transmission voltage operated by the DNOs (it is also known as a sub-transmission voltage), the voltages above this point (275kV and 400kV) are full transmission voltages […]
33kV Design – An Overview
This is a short post about the key ideas of 33kV design practices. In the UK, 33kV is the standard primary distribution voltage, but for the most part is owned and operated by the DNO – some larger consumers or generating sites will receive a connection at 33kV if the local 11kV network cannot support […]
11kV Design – A Quick Overview
This is a short post about the key ideas of 11kV design practices. In the UK, 11kV is the standard secondary distribution voltage (a few places have 6.6kV – and this can be thought if as almost identical for design approaches) – the reason for this, is that it allows transmission of a fairly large amount […]
Trant Engineering – Forest Park IoW Waste From Energy
Aurora are pleased to announce that they have been appointed by Trant Engineering, to assist with the electrical design of the new Energy From Waste facility, located in the Isle of Wight. Aurora’s scope include design and development of the HV electrical network, protection and control systems, generator synchronisation facilities, review of vendor documentation, assisting […]
EcoDev Group – Consultancy Framework
Aurora are please to announce that they have setup and ongoing support based contract with EcoDev Group, in order to provide specialist technical advice and services on a call off basis. The aim of the contract is to develop an integrated relationship between Aurora and EcoDev, to allow EcoDev to utilise Aurora’s knowledge base and […]
UCP Choice – Cavendish Power
Aurora are pleased to announce that they have been selected by UCP Choice to carry out a series of power system studies for a new 8MW STOR project at Cavendish Road, Stevenage. As part of Aurora’s scope we will be carrying out a G74 /IEC 60909 short circuit study, a G5/4 Harmonic Analysis and a […]
Energy Assets – Earthing Study For Glasgow Park Quadrant
Aurora is pleased to announce that they have been appointed by Energy Assets to carry out a high level earthing study to support installation of a new secondary 11kV substation in Glasgow – Park Quadrant. Aurora will undertake a simple desktop study of this substation considering the site as part of a Global Earthing Network, […]