Aurora are pleased to announce that they have been selected by Fabri Consulting to carry out the HV design aspect of a ‘Select’ stage study, for an electrical upgrade project at the Shell Haven Terminal, at Standford-le-hope. Auroras scope is to develop the HV electrical design, and prepare a detailed protection and metering diagram, carry out the HV cable sizing activities, preparation of HV switchgear specification and datasheet, as well as to help draft the electrical section of the Define stage ITT documentation.
Aurora look forward to working with both Fabri and Shell on this key site upgrade project.