Saltend Power Station — Concept Study & LT2029
Concept study for adding rotating stabilisers to an existing 275 kV power station, followed by full LT2029 stability tender submission with RMS simulation studies.
South East Water — Site Surveys & Modelling
Rolling survey and ETAP modelling programme across eight critical water treatment works sites, establishing fault level and loadflow baselines ahead of planned solar and BESS upgrades.
Isle of Sark — Island Network Concept Design
Concept study for upgrading or replacing a 50-year-old island network, integrating solar PV, wind, grid-forming BESS and diesel backup with 100% renewable capability.
Welsh Power SynCon — Earthing Design
Detailed CDEGS earthing designs for four NESO Stability Pathfinder synchronous compensator sites at 275 kV and 400 kV — Gretna, Neilston, Rothienorman and Thurso.
Swansea North — 400 kV Cable Design
Complete 400 kV single-circuit cable design covering current rating, sheath voltage, bonding scheme, pulling forces and joint bay drawings for a key substation upgrade.
Indian Queens BESS — Grid Code Compliance
Grid Code compliance for a 50 MW BESS at NGET 33 kV, including RMS, EMT, SSO study, protection coordination and insulation coordination.
Akira BESS — Grid Code Compliance
Grid Code compliance for a 57 MW BESS connecting at an SGT tertiary 33 kV winding, with full RMS, EMT, protection, P28, G5.5 and insulation coordination.
Pines Burn Wind Farm — Grid Code Compliance
Full Grid Code compliance package for a 49 MW onshore wind farm at SSEN 33 kV, including RMS, EMT, SSO, P28, G5.5, insulation coordination and earthing.
Upper Boat — 275 kV Cable Design
Complete 275 kV dual-circuit cable design covering current rating, sheath voltage, bonding scheme, pulling forces, joint bay drawings and route layout.
