Onshore wind brings a different dynamic profile to a BESS or solar site, with turbine behaviour, pitch control and the wind farm controller all influencing the response that Grid Code studies need to demonstrate. The compliance evidence has to reflect that, rather than relying on a generic inverter based generation template.
Aurora delivered the full Grid Code compliance package for the site including RMS and EMT simulations to GC0141 and PC.A.9, P28 (RVC/SVC), G5.5 harmonics, TGN 288E insulation coordination, DRC schedules, and a full protection coordination study.
Key Features
Client: Powersystems UK
Capacity: 49 MW onshore wind
Connection: SSEN 33 kV
Software: DIgSILENT PowerFactory and PSCAD