Crystal Rig IV — 49 MW Onshore Wind Balance of Plant
Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.
Mersey Reactive Power — Shunt Reactor Energisation
TOV/SOV and TRV/RRRV study for a 200 MVAr 400 kV shunt reactor using PSCAD, confirming circuit breaker performance against TGN 288E for National Grid energisation.
Coylton BESS — Grid-Forming Compliance
Full Grid Code compliance for a 50 MW grid-forming BESS at 275 kV, covering RMS, EMT, protection, P28, G5.5, insulation coordination and earthing.
Sanquhar II Wind Farm — Grid Code Compliance
Grid Code compliance for one of the UK’s largest onshore wind farms (250 MW, 132 kV), including RMS, EMT, P28, G5.5, insulation coordination and 132 kV earthing.
Indian Queens BESS — Grid Code Compliance
Grid Code compliance for a 50 MW BESS at NGET 33 kV, including RMS, EMT, SSO study, protection coordination and insulation coordination.
Akira BESS — Grid Code Compliance
Grid Code compliance for a 57 MW BESS connecting at an SGT tertiary 33 kV winding, with full RMS, EMT, protection, P28, G5.5 and insulation coordination.
Pines Burn Wind Farm — Grid Code Compliance
Full Grid Code compliance package for a 49 MW onshore wind farm at SSEN 33 kV, including RMS, EMT, SSO, P28, G5.5, insulation coordination and earthing.