Sanquhar II Wind Farm — Grid Code Compliance
Grid Code compliance for one of the UK’s largest onshore wind farms (250 MW, 132 kV), including RMS, EMT, P28, G5.5, insulation coordination and 132 kV earthing.
Stoneshollow / Doverdale / Langford — G99 Studies
Simultaneous delivery of G99 Type D compliance packages, P28 assessment and HV cable sizing for three 49 MW hybrid solar and BESS sites at 132 kV.
Coylton BESS — Grid-Forming Compliance
Full Grid Code compliance for a 50 MW grid-forming BESS at 275 kV, covering RMS, EMT, protection, P28, G5.5, insulation coordination and earthing.
Indian Queens BESS — Grid Code Compliance
Grid Code compliance for a 50 MW BESS at NGET 33 kV, including RMS, EMT, SSO study, protection coordination and insulation coordination.
Akira BESS — Grid Code Compliance
Grid Code compliance for a 57 MW BESS connecting at an SGT tertiary 33 kV winding, with full RMS, EMT, protection, P28, G5.5 and insulation coordination.
Pines Burn Wind Farm — Grid Code Compliance
Full Grid Code compliance package for a 49 MW onshore wind farm at SSEN 33 kV, including RMS, EMT, SSO, P28, G5.5, insulation coordination and earthing.