Crystal Rig IV — 49 MW Onshore Wind Balance of Plant
Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.
SSDE Onshore Substation — 400 kV Earthing Design
Earthing design for a new 400 kV onshore substation serving an offshore wind farm — CDEGS soil resistivity analysis, EPR and touch/step voltage assessment.
Sanquhar II Wind Farm — Grid Code Compliance
Grid Code compliance for one of the UK’s largest onshore wind farms (250 MW, 132 kV), including RMS, EMT, P28, G5.5, insulation coordination and 132 kV earthing.
Isle of Sark — Island Network Concept Design
Concept study for upgrading or replacing a 50-year-old island network, integrating solar PV, wind, grid-forming BESS and diesel backup with 100% renewable capability.
Dogger Bank D — HVDC & HVAC Cable Sizing
Cable containment and sizing study for 50 km of 320 kV HVDC plus 5 km of 400 kV HVAC cable for one of the UK’s largest offshore wind projects.
Pines Burn Wind Farm — Grid Code Compliance
Full Grid Code compliance package for a 49 MW onshore wind farm at SSEN 33 kV, including RMS, EMT, SSO, P28, G5.5, insulation coordination and earthing.
