LT2029 Electricity Restoration Services — RWE
LT2029 Electricity Restoration Services tender studies for Didcot B, Staythorpe and Pembroke power stations, developing full generator control system models within one month.
Woking & Milton Keynes — iDNO Network Studies
Loadflow, short circuit, protection coordination and CDEGS earthing studies for two town-centre private iDNO networks at Woking and Milton Keynes.
Mersey Reactive Power — Shunt Reactor Energisation
TOV/SOV and TRV/RRRV study for a 200 MVAr 400 kV shunt reactor using PSCAD, confirming circuit breaker performance against TGN 288E for National Grid energisation.
Marchwood Power Station — Grid Code Compliance
RMS and EMT compliance models for 3× synchronous generators (1014 MVA total) at 400 kV, with custom AVR, OEL, UEL and SCL governor models.
Upper Boat — 275 kV Cable Design
Complete 275 kV dual-circuit cable design covering current rating, sheath voltage, bonding scheme, pulling forces, joint bay drawings and route layout.