EFW Private Wire — Concept Studies

Concept studies for two energy-from-waste private wire supply schemes, assessing loadflow, fault levels, changeover operation, UPS behaviour and LV backup under all operating modes.

Upper Boat — 275 kV Cable Design

Complete 275 kV dual-circuit cable design covering current rating, sheath voltage, bonding scheme, pulling forces, joint bay drawings and route layout.