Ironbridge — 132 kV Cable Sizing

132 kV cable sizing over existing NGET legacy fluid-filled cables, with optioneering on road cover depth and backfill material to protect the circuit rating.

Welsh Power SynCon — Earthing Design

Detailed CDEGS earthing designs for four NESO Stability Pathfinder synchronous compensator sites at 275 kV and 400 kV — Gretna, Neilston, Rothienorman and Thurso.

Swansea North — 400 kV Cable Design

Complete 400 kV single-circuit cable design covering current rating, sheath voltage, bonding scheme, pulling forces and joint bay drawings for a key substation upgrade.

EFW Private Wire — Concept Studies

Concept studies for two energy-from-waste private wire supply schemes, assessing loadflow, fault levels, changeover operation, UPS behaviour and LV backup under all operating modes.