Ironbridge — 132 kV Cable Sizing
132 kV cable sizing over existing NGET legacy fluid-filled cables, with optioneering on road cover depth and backfill material to protect the circuit rating.
Indian Queens Power Station — Protection & Stability
Ongoing support for a 135 MW dual-fuel gas turbine at 400 kV, covering MV protection coordination, fault level, GCB assessment and synchronous condenser options.
LT2029 Stability Tender — Grid-Forming BESS & SynCon
LT2029 stability tender studies comparing three grid-forming OEM inverter solutions and completing synchronous condenser submissions at High Marnham and New Woolavington.
Saltend Power Station — Concept Study & LT2029
Concept study for adding rotating stabilisers to an existing 275 kV power station, followed by full LT2029 stability tender submission with RMS simulation studies.
Dogger Bank D — HVDC & HVAC Cable Sizing
Cable containment and sizing study for 50 km of 320 kV HVDC plus 5 km of 400 kV HVAC cable for one of the UK’s largest offshore wind projects.
Welsh Power SynCon — Earthing Design
Detailed CDEGS earthing designs for four NESO Stability Pathfinder synchronous compensator sites at 275 kV and 400 kV — Gretna, Neilston, Rothienorman and Thurso.
Swansea North — 400 kV Cable Design
Complete 400 kV single-circuit cable design covering current rating, sheath voltage, bonding scheme, pulling forces and joint bay drawings for a key substation upgrade.
EFW Private Wire — Concept Studies
Concept studies for two energy-from-waste private wire supply schemes, assessing loadflow, fault levels, changeover operation, UPS behaviour and LV backup under all operating modes.
Northern Powergrid — BESS Integration Policy
NIA-funded policy development for large-scale BESS integration on distribution networks, including aggregated disturbance analysis and a DIgSILENT PowerFactory assessment tool.