HV Energy Systems

Adstock 14MW Solar PV

G99 Studies

Aurora was commissioned by HV Energy Systems to carry out a series of power systems studies in order to meet compliance with the DNO for G99 for a new 14MW Solar PV site.

The scope included the full suite of studies to meet compliance with the DNO:

  • G99: Loadflow & reactive capability
  • G99: Fault Ride Through, LV Ride Through and Fast Fault Current Injection
  • G99: Voltage Control and Stability
  • G99: Frequency Control
  • G99: PPC Verification
  • ENA P28/2
  • ENA G5.5 Stage 3 Harmonics
  • Short Circuit Study
  • Protection Coordination
Key Features

Client: HV Energy Systems
Industry: Renewables
Plant Type: Solar PV
Project: Adstock 14MW Solar PV
Contract: Lump Sum
Date: 2023

“Aurora was appointed by HV Energy Systems to carry out a series of power system studies for a new greenfield development for a 14MW Solar PV facility, requiring full G99 Type C compliance studies.”