Isle Of Wight - St Mary's Hospital

Protection Coordination Study

Aurora was commissioned by High Voltage Energy Systems to carry out a site wide protection coordination study for the system, using DIgSILENT Powerfactory. Aurora carried out a full coordination study from the DNO incomers, through to the largest outgoing circuit on each LV switchboard, recommending a number of changes to the existing protection settings to ensure that full grading was acheived across the network.

Key Features

Client: HVES
Industry: Building Services
Plant Type: Hospital
Project: Protection Study
Contract: Lump Sum
Date: 2022

“Aurora was appointed to undertake a site survey and subsequent protection coordination study for St Mary Hospital on the Isle of Wight.”