Aurora was contracted by High Voltage Power Systems Ltd, to carry out a protection study for a planned major refurbishment of the Basingstoke hospital.
Aurora’s scope included organising a site survey for the existing protection devices, and equipment; reviewing the proposed SLDs to ensure that sufficient reliability was maintained in the emergency system, before creating a model of the whole electrical system in DIgSILENT Powerfactory. Once the DIgSILENT model was created, a number of different protection coordination cases were carried out for the normal and emergency operation cases.
Client: High Voltage Power Systems
Industry: Building Services
Plant Type: Hospital
Project: Power System Studies
Contract: Lump Sum
Date: 2023
“Aurora was appointed to undertake a fault study and protection coordination study for an upgrade of an existing hospital.”
Aurora Power Consulting are a leading independent power systems consultancy. We provide specialist power systems analysis services using software such as DIgSILENT, ETAP, PSCAD, EMTP-ATP, CDEGS and XGSLab.