High Voltage Power Systems

Protection Study

South Hants Hospital

Aurora was contracted by High Voltage Power Systems Ltd, to carry out a protection study for a planned major refurbishment of the Basingstoke hospital.

Aurora’s scope included organising a site survey for the existing protection devices, and equipment; reviewing the proposed SLDs to ensure that sufficient reliability was maintained in the emergency system, before creating a model of the whole electrical system in DIgSILENT Powerfactory. Once the DIgSILENT model was created, a number of different protection coordination cases were carried out for the normal and emergency operation cases.

 

 

Key Features

Client: High Voltage Power Systems
Industry: Building Services
Plant Type: Hospital
Project: Power System Studies
Contract: Lump Sum
Date: 2023

“Aurora was appointed to undertake a fault study and protection coordination study for an upgrade of an existing hospital.”