Emico

Earthing Study

Atlas Road & VRCB

Aurora was commissioned by Emico to carry out an earthing study for the Atlas Road and Victoria Road Cross Box sites for the HS2 Rail Line.

Aurora carried out an initial site soil resistivity survey, and then created a model of the whole electrical system using the CDEGS modelling package to assess the individual substation Earth Potential Rise (EPR) along with the associated touch and step voltages. Finally, Aurora then developed a series of installation drawings and layouts for the proposed earthing systems.

 

Key Features

Client: Emico
Industry: Industrial
Plant Type: Rail
Project: Earthing Study
Contract: Lump Sum
Date: 2022

“Aurora was appointed to undertake a site soil resistivity survey and CDEGS earthing study for the Atlas Road and Victoria Cross Box HS2 sites.”