Home » Case Studies » UCP Choice – Holes Bay 11kV, 7.5MW Battery Storage
Aurora was contracted by UCP Choice to carry out a number of power system studies for one of the first deployments of a TESLA Megapack, battery energy storage system within the UK. The site consisted of 3 new 2.5MW Megapacks, connected to the SSE system at 11kV, and Aurora were responsible for carrying out a P28 Study, reactive power flow (G99) study, protection coordination study, G5/4 Stage 2 harmonic study and an arc flash study.
Client: UCP Choice
Industry: Renewables
Plant Type: Battery Storage
Project: System Studies
Contract: Lump Sum
Date: 2019
“Aurora carried out a P28 Transformer Energisation Study, G5/4 Stage 2 Harmonics Study and an Earthing Study.”
Aurora Power Consulting are a leading independent power systems consultancy. We provide specialist power systems analysis services using software such as DIgSILENT, ETAP, PSCAD, EMTP-ATP, CDEGS and XGSLab.