LT2029 Stability Tender — Grid-Forming BESS & SynCon
LT2029 stability tender studies comparing three grid-forming OEM inverter solutions and completing synchronous condenser submissions at High Marnham and New Woolavington.
Saltend Power Station — Concept Study & LT2029
Concept study for adding rotating stabilisers to an existing 275 kV power station, followed by full LT2029 stability tender submission with RMS simulation studies.
LT2029 Electricity Restoration Services — RWE
LT2029 Electricity Restoration Services tender studies for Didcot B, Staythorpe and Pembroke power stations, developing full generator control system models within one month.
Topaz Offshore Rig — Full Study Suite
Complete power system study suite for an offshore rig upgrade with new modular drilling unit, covering loadflow, fault level, motor starting, harmonics, stability and protection.
Karsang Oil Field — Full Study Suite
Full power system study suite for a greenfield oil field in Kurdistan, covering loadflow, short circuit, motor starting, protection, arc flash, harmonics and stability in ETAP.
Marchwood Power Station — Grid Code Compliance
RMS and EMT compliance models for 3× synchronous generators (1014 MVA total) at 400 kV, with custom AVR, OEL, UEL and SCL governor models.
