Crystal Rig IV — 49 MW Onshore Wind Balance of Plant

Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.

Exeter University — Protection Study

Short circuit and full protection coordination study for a large university campus network with three ring feeders including normally-closed Translay cable differential protection.

Topaz Offshore Rig — Full Study Suite

Complete power system study suite for an offshore rig upgrade with new modular drilling unit, covering loadflow, fault level, motor starting, harmonics, stability and protection.