Crystal Rig IV — 49 MW Onshore Wind Balance of Plant
Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.
Woking & Milton Keynes — iDNO Network Studies
Loadflow, short circuit, protection coordination and CDEGS earthing studies for two town-centre private iDNO networks at Woking and Milton Keynes.
Coylton BESS — Grid-Forming Compliance
Full Grid Code compliance for a 50 MW grid-forming BESS at 275 kV, covering RMS, EMT, protection, P28, G5.5, insulation coordination and earthing.
Indian Queens Power Station — Protection & Stability
Ongoing support for a 135 MW dual-fuel gas turbine at 400 kV, covering MV protection coordination, fault level, GCB assessment and synchronous condenser options.
Falklands Mount Pleasant Airbase
Full ETAP modelling of a large 11 kV islanded network with 70+ substations, covering loadflow, short circuit, protection coordination and arc flash.
Sanquhar II Wind Farm — Grid Code Compliance
Grid Code compliance for one of the UK’s largest onshore wind farms (250 MW, 132 kV), including RMS, EMT, P28, G5.5, insulation coordination and 132 kV earthing.
EFW Private Wire — Concept Studies
Concept studies for two energy-from-waste private wire supply schemes, assessing loadflow, fault levels, changeover operation, UPS behaviour and LV backup under all operating modes.
Capita Secure Data Centre — Protection Study
Loadflow, short circuit and full protection coordination study for a classified secure data centre in Cornwall, covering HV, LV, UPS and cable differential protection.
ICE Data Centre — Protection & Arc Flash
Loadflow, short circuit, protection coordination and arc flash study for a key London financial data centre handling London and New York stock exchange trading.