Crystal Rig IV — 49 MW Onshore Wind Balance of Plant

Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.

Falklands Mount Pleasant Airbase

Full ETAP modelling of a large 11 kV islanded network with 70+ substations, covering loadflow, short circuit, protection coordination and arc flash.

EFW Private Wire — Concept Studies

Concept studies for two energy-from-waste private wire supply schemes, assessing loadflow, fault levels, changeover operation, UPS behaviour and LV backup under all operating modes.