Crystal Rig IV — 49 MW Onshore Wind Balance of Plant
Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.
Sanquhar II Wind Farm — Grid Code Compliance
Grid Code compliance for one of the UK’s largest onshore wind farms (250 MW, 132 kV), including RMS, EMT, P28, G5.5, insulation coordination and 132 kV earthing.
Stoneshollow / Doverdale / Langford — G99 Studies
Simultaneous delivery of G99 Type D compliance packages, P28 assessment and HV cable sizing for three 49 MW hybrid solar and BESS sites at 132 kV.
Topaz Offshore Rig — Full Study Suite
Complete power system study suite for an offshore rig upgrade with new modular drilling unit, covering loadflow, fault level, motor starting, harmonics, stability and protection.
Karsang Oil Field — Full Study Suite
Full power system study suite for a greenfield oil field in Kurdistan, covering loadflow, short circuit, motor starting, protection, arc flash, harmonics and stability in ETAP.
Stublach Gas Storage — Protection & Arc Flash
ETAP study suite for a 40 MW gas storage plant connecting new VSD compressors, covering loadflow, short circuit, full protection re-grading and arc flash investigation.
Woking & Milton Keynes — iDNO Network Studies
Loadflow, short circuit, protection coordination and CDEGS earthing studies for two town-centre private iDNO networks at Woking and Milton Keynes.
Coylton BESS — Grid-Forming Compliance
Full Grid Code compliance for a 50 MW grid-forming BESS at 275 kV, covering RMS, EMT, protection, P28, G5.5, insulation coordination and earthing.
Indian Queens BESS — Grid Code Compliance
Grid Code compliance for a 50 MW BESS at NGET 33 kV, including RMS, EMT, SSO study, protection coordination and insulation coordination.