Crystal Rig IV — 49 MW Onshore Wind Balance of Plant

Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.

Falklands Mount Pleasant Airbase

Full ETAP modelling of a large 11 kV islanded network with 70+ substations, covering loadflow, short circuit, protection coordination and arc flash.

Karsang Oil Field — Full Study Suite

Full power system study suite for a greenfield oil field in Kurdistan, covering loadflow, short circuit, motor starting, protection, arc flash, harmonics and stability in ETAP.

Akira BESS — Grid Code Compliance

Grid Code compliance for a 57 MW BESS connecting at an SGT tertiary 33 kV winding, with full RMS, EMT, protection, P28, G5.5 and insulation coordination.