Coylton BESS — Grid-Forming Compliance
Full Grid Code compliance for a 50 MW grid-forming BESS at 275 kV, covering RMS, EMT, protection, P28, G5.5, insulation coordination and earthing.
LT2029 Stability Tender — Grid-Forming BESS & SynCon
LT2029 stability tender studies comparing three grid-forming OEM inverter solutions and completing synchronous condenser submissions at High Marnham and New Woolavington.
Isle of Sark — Island Network Concept Design
Concept study for upgrading or replacing a 50-year-old island network, integrating solar PV, wind, grid-forming BESS and diesel backup with 100% renewable capability.
BESS Concept Studies — Transmission Network
Concept studies for seven large-scale EHV-connected BESS sites at 132–400 kV across Scotland, covering transformer sizing, fault ratings, modularisation and energisation.
Northern Powergrid — BESS Integration Policy
NIA-funded policy development for large-scale BESS integration on distribution networks, including aggregated disturbance analysis and a DIgSILENT PowerFactory assessment tool.
Stoneshollow / Doverdale / Langford — G99 Studies
Simultaneous delivery of G99 Type D compliance packages, P28 assessment and HV cable sizing for three 49 MW hybrid solar and BESS sites at 132 kV.
Broxburn & Cathkin — SSO Studies
Sub-synchronous oscillation studies for two 49 MW BESS sites at SSEN 33 kV, challenging NESO’s initial guidance and agreeing a practical methodology with the regulator.
Indian Queens BESS — Grid Code Compliance
Grid Code compliance for a 50 MW BESS at NGET 33 kV, including RMS, EMT, SSO study, protection coordination and insulation coordination.
Akira BESS — Grid Code Compliance
Grid Code compliance for a 57 MW BESS connecting at an SGT tertiary 33 kV winding, with full RMS, EMT, protection, P28, G5.5 and insulation coordination.
