Crystal Rig IV — 49 MW Onshore Wind Balance of Plant

Full balance-of-plant study suite for a 49 MW onshore wind farm at 132 kV — load flow, losses, short circuit, P28, G5.5, insulation coordination, earthing, protection and arc flash — plus detailed 33 kV cable sizing across 8 trench sections and 4 HDD/crossings.

Broxburn & Cathkin — SSO Studies

Sub-synchronous oscillation studies for two 49 MW BESS sites at SSEN 33 kV, challenging NESO’s initial guidance and agreeing a practical methodology with the regulator.