Culham Campus — Site-Wide Earthing Survey
Site-wide earthing condition survey across the Culham campus — soil resistivity, earth continuity and inter-substation return-path / sheath-bonding validation.
Exeter University — Protection Study
Short circuit and full protection coordination study for a large university campus network with three ring feeders including normally-closed Translay cable differential protection.
Southampton Hospital — Protection Study
Site survey, loadflow, short circuit and full protection coordination study for a large NHS hospital with two 11 kV intakes and embedded generators.
Woking & Milton Keynes — iDNO Network Studies
Loadflow, short circuit, protection coordination and CDEGS earthing studies for two town-centre private iDNO networks at Woking and Milton Keynes.