Isle of Sark — Island Network Concept Design
Concept study for upgrading or replacing a 50-year-old island network, integrating solar PV, wind, grid-forming BESS and diesel backup with 100% renewable capability.
Saltend Power Station — Concept Study & LT2029
Concept study for adding rotating stabilisers to an existing 275 kV power station, followed by full LT2029 stability tender submission with RMS simulation studies.
LT2029 Stability Tender — Grid-Forming BESS & SynCon
LT2029 stability tender studies comparing three grid-forming OEM inverter solutions and completing synchronous condenser submissions at High Marnham and New Woolavington.
Sanquhar II Wind Farm — Grid Code Compliance
Grid Code compliance for one of the UK’s largest onshore wind farms (250 MW, 132 kV), including RMS, EMT, P28, G5.5, insulation coordination and 132 kV earthing.
Falklands Mount Pleasant Airbase
Full ETAP modelling of a large 11 kV islanded network with 70+ substations, covering loadflow, short circuit, protection coordination and arc flash.
Coylton BESS — Grid-Forming Compliance
Full Grid Code compliance for a 50 MW grid-forming BESS at 275 kV, covering RMS, EMT, protection, P28, G5.5, insulation coordination and earthing.
LT2029 Electricity Restoration Services — RWE
LT2029 Electricity Restoration Services tender studies for Didcot B, Staythorpe and Pembroke power stations, developing full generator control system models within one month.
ICE Data Centre — Protection & Arc Flash
Loadflow, short circuit, protection coordination and arc flash study for a key London financial data centre handling London and New York stock exchange trading.
Stoneshollow / Doverdale / Langford — G99 Studies
Simultaneous delivery of G99 Type D compliance packages, P28 assessment and HV cable sizing for three 49 MW hybrid solar and BESS sites at 132 kV.