Earthing & Grounding

Culham Campus — Site-Wide Earthing Survey

Condition survey of the existing earthing infrastructure across the campus


The challenge

The Culham campus has an extensive HV distribution network built up over many years, and the condition and integrity of the existing earthing infrastructure needed to be established before further development.

What Aurora did

We carried out a site-wide earthing investigation and survey to assess the condition of the existing earthing infrastructure. This included soil resistivity tests and earth continuity tests within each substation and between the individual substations, validating the earth return paths and sheath bonding across the site.

Study types & sectors
EarthingBuilding Services