Aurora was commissioned by HV Energy Systems to carry out a series of power systems studies in order to meet compliance with the DNO for G99 for a new 14MW Solar PV site.
The scope included the full suite of studies to meet compliance with the DNO:
G99: Loadflow & reactive capability
G99: Fault Ride Through, LV Ride Through and Fast Fault Current Injection
G99: Voltage Control and Stability
G99: Frequency Control
G99: PPC Verification
ENA P28/2
ENA G5.5 Stage 3 Harmonics
Short Circuit Study
Protection Coordination
Key Features
Client: HV Energy Systems
Industry: Renewables
Plant Type: Solar PV
Project: Adstock 14MW Solar PV
Contract: Lump Sum
Date: 2023
“Aurora was appointed by HV Energy Systems to carry out a series of power system studies for a new greenfield development for a 14MW Solar PV facility, requiring full G99 Type C compliance studies.”