Grid Code Compliance Studies
Grid Code studies for larger sites directly connected to the National Grid Electricity Transmission Network, or sites above 50MW (or 30MW and 10MW in North and South Scotland) are required to be fully compliant with the National Grid Code. Thanks to the G99 and the European RfG there is a pretty close alignment between G99 […]