Home » Case Studies » Powersystems UK – Benbrack 66.7MW Windfarm
Powersystems UK
Benbrack 66.7MW Windfarm
Grid Studies
Aurora was commissioned by Powersystems UK to carry out a series of power systems studies in order to meet compliance with the Grid Code for a new 66.7MW onshore windfarm, for a new greenfield development
The scope included a suite of studies to meet compliance with SPEN:
Short Circuit Study
P28/2 Study
ENA G5.5 Stage 3 Harmonics
Insulation coordination
Lightning Risk Assessment
Protection Coordination
ENA 41-24 Earthing Study
Key Features
Client: Powersystems UK
Industry: Renewables
Plant Type: Onshore Wind
Project: Benbrack 66.7MW Wind Farm
Contract: Lump Sum
Date: 2023
“Aurora was appointed by Powersystems UK to carry out a series of power system studies for a new greenfield development for an onshore 66.7MW windfarm, requiring full Grid Code compliance studies.”