Home » Case Studies » AICA – Rainbarrow Anaerobic Digester Earthing Study
Aurora was contracted by AICA to carry out an earthing design and earthing study for a major upgrade of one so the UK first anaerobic digestion sites.
Aurora’s scope included undertaking a detailed site survey or the existing earthing infrastructure, detailed design of the earthing system and tie-in to the existing earthing system, soil resistivity survey and post installation Fall of Potential test.
Client: AICA
Industry: Generation
Plant Type: Anaerobic Digestion
Project: Earthing Study
Contract: Lump Sum
Date: 2020
“Aurora was appointed to undertake an earthing study and design for an upgrade of an Anaerobic Digestion site.”
Aurora Power Consulting are a leading independent power systems consultancy. We provide specialist power systems analysis services using software such as DIgSILENT, ETAP, PSCAD, EMTP-ATP, CDEGS and XGSLab.