Home » Case Studies » Smith Brothers – Ernesettle 20MW BESS
Aurora was commissioned by Smith Brothers to carry out a series of power systems studies in order to meet compliance with the DNO, for a new 20MW Battery Energy Storage Site (BESS), as a brownfield development of a previous STOR facility.
The studies scope included loadflow, short circuit, P28/2 voltage disturbance, P29 unbalance, ENA G5.4 Stage 3 harmonics, G99 Type C studies and protection coordination; which were all carried out using the DIgSILENT Powerfactory software package.
In addition to the power system studies, Aurora also carried out a soil resistivity survey and an earthing study in CDEGS to identify the Earth Potential Rise (EPR), touch and step voltages and transfer risks from the upstream grid substation.
Client: Smith Brothers
Industry: Renewables
Plant Type: Battery Storage
Project: Ernesettle
Contract: Lump Sum
Date: 2022
“Aurora was appointed by Smith Brothers to carry out a series of power system studies for a redevelopment of an existing STOR site into a new 20MW BESS facility.”
Aurora Power Consulting are a leading independent power systems consultancy. We provide specialist power systems analysis services using software such as DIgSILENT, ETAP, PSCAD, EMTP-ATP, CDEGS and XGSLab.