Northumbrian Water

Solar PV Enabling Works

Aurora was appointed by Ennoviga / Northumbrian Water to undertake a series of site surveys and initial enabling work to allow deployment of a series of Solar PV installations across five sites. The project scope included attending each site to carry out a detailed survey to confirm the system configuration and identify suitable tie in locations, before preparing an overall site SLD. once the initial assessment was complete Aurora then built a model of the system using DIgSILENT Powerfactory in order to carry out a high level loadflow and short circuit study, before then modelling the network in CDEGS to carry out an earthing study.

Key Features

Client: Northumbrian Water 
Industry: Water
Plant Type: Water
Project:
Contract: Lump Sum
Date: 2021

“Aurora was appointed to undertake a series of site surveys and initial enabling work to allow deployment of a series of Solar PV installations across five sites.”