Aurora are pleased to announce that they have been selected by PSC to carry out a series of power system studies for a new 5MW PV Solar array at the Lower Ninestones site in Cornwall, UK. As part of Aurora’s scope we will be carrying out a G5/4 Harmonic Analysis and a P28 Voltage Disturbance Study to ensure that the operation of the site does not adversely affect the nearby WPD electrical network. The studies will all be carried out using the DigSilent Powerfactory software.
Aurora look forward to working with PSC and helping facilitate connection of this important project.