SSE Contracting - OPA

Protection Design

Thacknes Site

Aurora was contracted by SSE Contracting to develop a new inter-tripping scheme between an upstream main substation and a downstream 11/0.4kV Jetty substation for the Thanckes site

Aurora’s scope included carrying reviewing the existing system schematic drawings, idetnfiying the correct tripping and auxiliary relays and then preparing a cable block diagram and the associated wiring schematics to implement the scheme.

 

Key Features

Client: SSE Contracting
Industry: Oil & Gas
Plant Type: Oil Pumping Station
Project: Consultancy
Contract: Lump Sum
Date: 2019

“Aurora was appointed to undertake a detail design for a new inter-tripping scheme between an upstream substation and the downstream Jetty substation.”