Little Raith 40 MW Battery Storage

Detail Design

Aurora was commissioned by Integrated Utility Services (IUS) to carry out a full detail design for a new a 50MW Type C battery energy storage system (BESS) located north of Edinburgh. The scope included development of the overall SLD, protection SLD, cable sizing, cable layout, cable schedule, SCADA design, earthing design and analysis, lightning protection, CT sizing and protection study.

Key Features

Client: Little Raith
Industry: Renewables & Storage 
Plant Type: 50MW Battery Storage
Project: Detail Design
Contract: Lump Sum
Date: 2023

“Aurora was appointed to undertake a full detail design for a new 50MW Battery Storage System.”