Ethical Power Connections

Power System Studies

Churchover

Aurora was contracted by Ethical Power Connections, to carry out a series of HV design activities and a series of power system studies to support development of a new 33kV, 12MW solar PV array located in the UK.

Aurora were responsible for carrying out the power system study activities for the site, which included carrying out an IEC 60909 short circuit study, a Loadflow Analysis, P28 Voltage Disturbance Study, G99 Type C studies and Protection coordination study. The studies were all be carried out using DIgSILENT Powerfactory.

Key Features

Client: Ethical Power
Industry: Renewables
Plant Type: Solar / PV
Project: HV Design & Studies
Contract: Lump Sum
Date: 2020

“Aurora was appointed to carry out a variety of HV design and study activities for a new 12MW Solar PV site.”