Lark Power Services

Power System Studies

7.5MW STOR Generation

Aurora was contracted by Lark Power Services to undertake a wide range of power system studies for a new 7.5MW diesel generating plant in Derbyshire, for the new STOR / EFR response contracts.

Aurora’s scope included a short circuit G74 study and protection coordination study using the ETAP software package. This required the creations of a detailed model of the whole power system, and a Time Current Curve plot generated for each of the main overcurrent and earth fault coordination scenarios.

Aurora also carried out a detailed P28 transformer energisation study using the EMTP-ATP simulation package to determine the voltage disturbance caused by energising the transformers individually or as a group. This study also reviewed the long-term and short-term flicker created by the PV units on the network.

In addition, Aurora also carried out a detailed analysis of the HV and LV earthing system using the CDEGS design package. After subcontracting a soil resistivity study to a local company, Aurora developed a detailed model of the soil layers, fault current return paths and the earth grid, before carrying out Earth Potential Rise (EPR) calculations and comprehensive touch and step voltage calculations for the site.

Key Features

Client: Lark Power Services
Industry: Generation
Plant Type: Gas Generation
Project: System Studies
Contract: Lump Sum
Date: 2017

“Aurora was appointed to undertake a range of power system studies to support construction of a new 7.5MW generating station.”