Home » Case Studies » Prestige Power – Buckley Barracks
Aurora was appointed by Prestige Power Ltd, to carry out a full arch flash study for a planned upgrade of a private 11kV network for an MOD site.
Aurora’s scope included organising a site survey for the existing protection devices, and equipment; reviewing the proposed SLDs, before creating a model of the whole electrical system in ETAP. Once the ETAP model was created, a number of different study cases were created and an arc flash study was carried out for each scenario to determine the incident energy levels and required PPE.
Client: Prestige Power
Industry: Building Services
Plant Type: Army Barracks
Project: Arc Flash Study
Contract: Lump Sum
Date: 2023
“Aurora was appointed to undertake an arc flash study for an upgrade of an existing private 11kV network.”
Aurora Power Consulting are a leading independent power systems consultancy. We provide specialist power systems analysis services using software such as DIgSILENT, ETAP, PSCAD, EMTP-ATP, CDEGS and XGSLab.