Aurora are please to announce that they have been appointed by Aptus Utilities Ltd., to carry out a range of earthing studies to ENA 41-24 for several different sites. Aurora will carry out the design using the CDEGS earthing design suite, to assess the site for the Earth Potential Rise and associated touch and step voltages.
We are pleased to be working with Aptus Utilities and look forward to establishing a long and mutually beneficial relationship.