Power for Wales – Solar Farms Earthing Studies

Aurora is pleased to announce that they have been appointed by Power For Wales to undertake a series of earthing studies for 2 different 1.5MW solar farms in South Wales. Aurora will coordinate the site soil resistivity measurement and undertake the overall site earthing design using the CDEGS package (RESAP, FCDIST and MALT) to determine […]

Fortress Recycling – DNO Connection

Aurora is pleased to announce that they have been appointed by Fortress Recycling, to coordinate the electrical DNO connection process to WPD’s 11kV electrical network. Aurora’s role is to take the initial equipment list provided by Fortress and convert this into a detailed electrical load list to determine the overall kVA load and power factor, […]

Huntec Energy

DNO approval specialists, Aurora, is pleased to announce that they have been appointed by Huntec Energy to undertake a series of studies for a new 5MW solar farm at Pollington in the UK. Aurora will undertake a series of studies for Huntec, to help the process of bringing the site on line and meeting the […]